"As-built" and "record drawings" get used as if they mean the same thing, and on a small job nobody minds. On a commercial project, a public contract or a closeout package, the words carry different meanings. They imply different people did the work and took different responsibility for it. Here's how the terms are usually used, how redlines and existing-conditions plans fit in, and what you need for a remodel.
Usage varies by owner, contract and region. When it matters, your contract or specifications decide what each term means on your project.
The short version
- Redlines (field markups): the contractor's markups on the construction set during the job, showing what changed in the field.
- As-built drawings: the drawings that show the project as the contractor actually built it, usually compiled from those redlines.
- Record drawings: the final set the design professional issues after construction, incorporating the contractor's as-built information, for the owner's records.
- Existing-conditions plan (often called an as-built plan in residential work): a new drawing of a building as it stands today, made from measurements, often years after it was built.
Redlines: where as-built information starts
Construction rarely goes exactly to plan. A duct gets rerouted around a beam, a door shifts a foot, a sleeve moves, or a field change is approved. The usual practice is for the contractor to mark these changes on a dedicated set of the construction drawings as the work happens. They're often in red ink, hence "redlines".
Redlines are the raw data. They're accurate only if someone keeps them up to date as work happens, not from memory at the end of the job. Many specifications require the contractor to keep the record set on site and current, and the owner's team may check it before approving payment.
As-built drawings
As-built drawings take the redlined information and show the project as constructed. Depending on the contract, they're the marked-up prints themselves, or a clean CAD update of the drawings with the changes drafted in.
The key point is who stands behind them: the contractor, because the contractor knows what was built. As-builts are often a closeout deliverable, and on many commercial jobs final payment depends on them.
Record drawings
Record drawings are typically prepared by the architect or engineer after construction. They take the contractor's as-built information and fold it into the design documents to produce a final set for the owner.
Many design professionals prefer the term "record drawings" on purpose. They didn't watch every pipe go in, so they don't want to certify that the drawings show exactly what was built. A record set usually carries a note saying it's based on information provided by the contractor. If someone asks you for "certified as-builts", read the contract carefully, because that word can change who carries the risk.
In the CSI MasterFormat system used for many US project specifications, closeout requirements like these are commonly found in Division 01, under project record documents. Check your own project manual for the exact section and wording.
Existing-conditions drawings: the "as-built" of an older building
This is the meaning most remodelers and trades have in mind. The house or tenant space was built decades ago. The original prints are lost or out of date, and you need a plan of what's actually there before you price a job or design a change.
In residential work this is often called an "as-built floor plan", even though nobody used the construction set to make it. A clearer name is existing-conditions plan. It's built from new field measurements: walk the building, measure each room and wall run, note openings and stairs, then draw it up.
It's important to be clear about what such a plan is and isn't:
- It's only as accurate as the measurements behind it.
- It isn't a boundary survey and doesn't establish property lines.
- It isn't a permit set or an engineered drawing. If your jurisdiction or project needs a licensed architect, engineer or surveyor, the plan is a base for their work, not a substitute for it.
Side-by-side comparison
| Redlines | As-built drawings | Record drawings | Existing-conditions plan | |
|---|---|---|---|---|
| When | During construction | At closeout | After closeout | Any time, often years later |
| Usually prepared by | Contractor (field) | Contractor | Architect / engineer | Whoever measures and drafts it |
| Source | Field changes | Redlines | Contractor's as-builts | New site measurements |
| Typical use | Keeping the record current | Closeout deliverable | Owner's permanent record | Remodel planning, bidding, layouts |
Which one do you need?
- You're closing out a project: follow your contract. It will say whether you owe marked prints, CAD as-builts, or information for the designer's record set.
- You're the owner of a finished building: ask for the record set and the as-builts, plus the CAD files, not just PDFs. A DWG is far more useful the next time someone renovates.
- You're planning a remodel of an older building: you almost certainly need an existing-conditions plan, measured fresh, because the old drawings rarely match the building anymore.
Turning measurements or redlines into a clean DWG
Many existing-conditions plans never get drafted properly. They stay as a pencil sketch on a clipboard or a phone photo of field notes. That's fine for one person, but it's hard to hand to a plumber, an estimator or a designer.
That's the work DWG Desk does. You measure and mark it up, and we redraw it in AutoCAD as a layered DWG plus a PDF. Walls, openings, text and dimensions sit on separate layers. Our as-built floor plans page covers existing-conditions drafting in detail. If you're starting from a hand drawing, see sketch to CAD. If you have a dimensioned scan of old prints, see PDF to DWG.
We draft from your measurements. We don't survey, stamp drawings or provide engineering, architectural or surveying services. Our terms spell out that scope. Prices start at $50 for a small floor plan, $75 for a standard plan and $100 for a complex first sheet, with $50 for each extra sheet. First-time customers can request one simple single-sheet floor plan free through the order form.
FAQ
What is the difference between as-built drawings and record drawings?
As-built drawings show the project as the contractor built it, usually compiled from the contractor's field redlines. Record drawings are the final set the architect or engineer issues afterwards, folding in the contractor's as-built information for the owner's records.
Who prepares as-built drawings?
Usually the contractor, who marks field changes on the drawings during construction and turns them over at closeout. Your contract decides the exact format and responsibility.
What are redline drawings?
Redlines are construction drawings marked up during the job, often in red, to show changes made in the field. They're the raw information behind as-built and record drawings.
Is an as-built floor plan the same as a survey?
No. An existing-conditions or as-built floor plan drawn from tape or laser measurements shows the building's layout. It doesn't establish property lines, and it isn't a stamped or permit-ready drawing.
Can DWG Desk make record drawings or certified as-builts?
No. DWG Desk is a drafting service. We redraw marked sketches, redlines and dimensioned PDFs as layered AutoCAD DWG files from the information you supply. We don't certify, stamp or survey.